Commercial Remodeling · Los Gatos, CA 95032
Commercial Warehouse Renovation

- Location
- Los Gatos, CA 95032
- Building systems
- 6 air-conditioning units installed
- Restroom
- Widened by 2 feet
The starting point.
An interior partition divided the warehouse. The renovation also needed to address the existing floors, roof, lighting, office finishes, and a leaking sewer line. The restroom required more width and an updated sink drain.
What we changed.
- Removed the interior partition to open up the warehouse.
- Ground the existing floors and applied epoxy floor paint.
- Applied silicone coating across the entire roof.
- Installed six air-conditioning units and new LED lights with new wiring.
- Widened the restroom by two feet; installed a new toilet, sink, and exhaust fan. Replaced the leaking sewer line and brought the sink drain up to code.
- Refreshed the office with painting, new baseboards, new doors, and updated interior lighting.
The finished result.
The completed photographs show one open warehouse interior with renewed flooring and lighting, alongside the refreshed office and expanded restroom. The gallery separates the original conditions, work in progress, and finished spaces so you can follow what changed.
The project in photographs.
Select a photo to enlarge. Use the arrows or swipe to explore.
Before





In Progress
After






















